Choose your screed and enter the floor dimensions. This screed calculator then estimates the materials, the typical installation price and the drying time. The first tab covers traditional sand and cement screed in tonnes and bags. The second estimates liquid screed in cubic metres, and the third calculates levelling compound.

Before you mix

Why screed orders fall short

Picture this. The screeder arrives at eight, the mixer is turning by nine, and the cement runs out before lunch. The order looked correct on paper. It used the finished volume of the floor, and nobody allowed for shrinkage.

Dry sand and cement shrink by roughly a quarter once you add water. Consequently, a floor requiring 1 m³ of screed actually consumes approximately 1.33 m³ of dry materials. Ignore that, and every quantity on the delivery note falls short.

Order on dry volume: the calculator multiplies your floor volume by 1.33 before dividing it into sand and cement. Those figures match our sand calculator exactly.

4:1 screed, per cubic metre
1.7 tsharp sand/16bags of cement

How much sand and cement for 1 m³ of screed?

One cubic metre of 4:1 screed requires approximately 1.7 tonnes of sharp sand and 15.3 bags of cement. Round up to 16 bags.

Typical laid price, 2026, ex VAT
£12–£20sand and cement/£18–£35liquid

How much does screed cost per m²?

Traditional screed typically costs £12 to £20 per m² installed. Liquid screed costs approximately £18 to £35, and smaller rooms cost proportionally more.

Three tabs

How to use the screed calculator

Select the tab that matches your floor, then complete the form from top to bottom. It works as a floor screed calculator, a liquid screed calculator and a cost estimator together.

  1. Sand and cement. Choose bonded, unbonded, floating or underfloor heating. The calculator recommends a sensible depth and warns you below the minimum.
  2. Liquid screed. Choose the construction and the pipe diameter. It checks the cover above the heating pipes and calculates the cubic metres to order.
  3. Levelling compound. Enter the average depth of the hollows. It then counts the bags of smoothing compound or renovation screed.
  4. Enter the floor area. Add rectangles for L-shaped rooms, or use a circle or a known total.
  5. Add prices if you have them. The calculator compares mixing your own, pre-mixed bags and ready-mixed screed, then highlights the most economical option.

Every result includes the typical installation price, so you can compare doing it yourself with hiring a professional screeder.

Know your screed

Which floor screed do you need?

Traditional screed combines sharp sand and cement, laid semi-dry and compacted by hand. Liquid screed is usually calcium sulphate, often called anhydrite, and a pump distributes it evenly.

ScreedHow it is laidBest for
Bonded sand and cementStuck to a clean slab with a bonding coatThin levelling over sound concrete
Unbonded sand and cementOn a polythene membraneOld slabs with damp or contamination
Floating sand and cementOn rigid insulationNew floors and extensions
Liquid calcium sulphatePumped in, then it flows levelUnderfloor heating and larger areas
Levelling compoundPoured thin, from 1 mmSmoothing before vinyl, wood or tiles

Laying the concrete slab first? Our concrete calculator sizes the base underneath.

Minimum depths

How thick should screed be?

Each construction method has its own minimum depth. Going thinner saves materials, but the floor eventually cracks, curls or separates from the slab.

ConstructionSand and cementLiquid screed
Bonded25 mm minimum, 40 mm ideal25 mm minimum
Unbonded50 mm minimum, 70 mm design30 mm minimum
Floating65 mm, or 75 mm for heavier loads35 mm minimum
Over underfloor heating65 mm total, 75 mm safer30 mm above the pipes

Minimum screed thickness from BS 8204 guidance. Below 25 mm, use a levelling compound instead.

The Concrete Centre guide to floor screeds explains the reasoning. Excessively thick bonded screeds can debond, and unbonded screeds that are too thin can curl. With 16 mm heating pipes, liquid screed therefore requires 46 mm, so most installers specify 50 mm.

Quick reference

How much screed do I need per m²?

Each millimetre of depth requires one litre of screed per square metre. These figures use a 4:1 mix with 5% extra, identical to the calculator.

DepthSharp sand per m²Cement per m²Laid weight per m²
25 mm45 kg10 kg52 kg
40 mm72 kg16 kg84 kg
50 mm89 kg20 kg105 kg
65 mm116 kg26 kg137 kg
75 mm134 kg30 kg158 kg
100 mm179 kg40 kg210 kg

Sand at 1.6 t/m³ and cement at 1.44 t/m³. Laid screed weighs about 2.1 t/m³.

Screed is surprisingly heavy, so a 75 mm floor adds approximately 158 kg to every square metre. Consult a structural engineer before you screed over timber joists.

Mix ratio

What is the best screed mix ratio?

Most UK floor screeds combine four parts sharp sand with one part cement. The Concrete Centre quotes a traditional range from 3:1 to 4.5:1.

MixUse it forSand per m³Cement per m³
3:1 (strong)Thin bonded screeds and heavy use1.6 t479 kg (19.2 bags)
4:1 (standard)Most homes and extensions1.7 t383 kg (15.3 bags)
4.5:1 (lean)Lightly loaded floating screeds1.74 t348 kg (13.9 bags)

Per cubic metre of finished screed, before waste. Dry materials at 1.33 times the volume.

Use washed sharp sand, sometimes sold as concreting or grit sand. Our sand calculator explains why soft building sand produces a weak, dusty floor. Mix the screed semi-dry, so a squeezed handful holds its shape without wetting your palm.

Cost

How much does it cost to screed a floor?

Screeding contractors price by the square metre, and most include materials and pumping. The Trade2Base 2026 price guide gives these supply and lay rates for floors over 30 m².

ScreedTypical depthLaid price per m² (ex VAT)
Sand and cement, bonded25–40 mm£12–£18
Sand and cement, unbonded50 mm£13–£19
Sand and cement, floating65–75 mm£14–£20
Liquid screed40–50 mm£18–£28
Liquid screed over heatingabout 50 mm£20–£35
Fibres addedAnyplus £1–£3

Floors under 20 m² usually pay a minimum charge of about £300 to £500. Pump hire costs about £300 to £600 a day.

Liquid screed price per m³ depends on the depth. At 50 mm, one cubic metre covers 20 m². Therefore £18 to £28 per m² equals £360 to £560 per m³ installed.

Our honest view? On floors over about 30 m², a professional screeder often costs little more than retail materials. Contractors buy materials at trade prices. A two-person gang can typically lay around 150 m² a day.

Drying time

How long does screed take to dry?

The usual UK guideline is one day per millimetre for the first 40 mm. Thicker screed dries considerably more slowly, so allow two days for each additional millimetre.

DepthSand and cementLiquid screed
25 mmabout 25 daysabout 25 days
40 mmabout 40 daysabout 40 days
50 mm50 to 60 daysabout 60 days
65 mm65 to 90 daysRarely this thick
75 mm75 to 110 daysRarely this thick

At about 20 °C with good ventilation. The lower figure follows the Concrete Centre rule of one day per millimetre up to 50 mm.

Light foot traffic is usually acceptable after a day or two. Before laying flooring, always test the moisture, because most coverings require 75% relative humidity or lower. With underfloor heating, liquid screed can typically begin force drying after about seven days.

Thin floors

How far does a bag of levelling compound go?

Self-levelling compound fills hollows from approximately 1 mm deep. Coverage depends on the powder weight per square metre for each millimetre. Two-part latex compounds suit timber floorboards and plywood.

Average depthSmoothing compound (1.6 kg)Renovation screed (1.8 kg)
2 mm7.8 m² per 25 kg bag6.9 m² per 25 kg bag
3 mm5.2 m²4.6 m²
5 mm3.1 m²2.8 m²
10 mm1.6 m²1.4 m²
20 mmToo deep0.7 m²

Coverage in kilograms per m² per millimetre of depth. Check your bag, then choose Custom in the calculator if it differs.

The Mapei data sheet says one bag of Ultraplan Renovation Screed 3240 covers about 6 m² at 3 mm. Its own mix density of 2,100 kg/m³ suggests nearer 4.7 m². We use the safer figure, so you will not run short during the pour.

Real floors

Screed calculator examples for UK floors

We calculated each floor with the screed calculator, using its default settings.

Example 1: kitchen extension over underfloor heating

A 5 × 4 m floating screed at 75 mm, 4:1 with fibres

Materials
2.68 tonnes of sharp sand, so four bulk bags, plus 25 bags of cement
Fibres
1.4 kg of polypropylene fibres
Laid price
£300 to £460 ex VAT, ready in about 75 to 110 days

Example 2: the same floor in liquid screed

20 m² at 50 mm over 16 mm heating pipes

Order
1.1 m³ of liquid screed
Laid price
£400 to £700 ex VAT, dry in about 60 days

Liquid screed costs more here, yet it sits 25 mm thinner and dries several weeks sooner.

Example 3: bathroom levelling screed

6 m² bonded to the slab at 40 mm, 3:1

Materials
402 kg of sharp sand and five bags of cement
Laid price
A screeder charges the minimum, about £300 to £500 ex VAT

Example 4: hallway before new vinyl

12 m² of smoothing compound at an average 3 mm

Powder
63 kg, so three 25 kg bags
Coverage
Each bag covers about 5.2 m² at 3 mm

Example 5: old tiles before new flooring

10 m² of fibre renovation screed at 15 mm

Powder
297 kg, so twelve 25 kg bags
Next step
New tiles can follow after 3 to 12 hours
Compare

Sand and cement or liquid screed?

Both produce an excellent floor when installed properly. The right choice depends on heating, area, budget and timing.

FactorSand and cementLiquid screed
Floating depth65 mm minimum35 mm minimum
Over heating pipes65–75 mm in total30 mm above the pipes
Typical laid price£12–£20 per m²£18–£35 per m²
SpeedLaid and compacted by handUp to 2,000 m² a day by pump
Wet rooms and steel meshSuitableAvoid both

Our honest opinion? Over underfloor heating, we would choose liquid screed. It surrounds the pipes completely, sits thinner and warms the room sooner. For a small bathroom or a garage, traditional screed is more economical.

Watch out

Screed mistakes that crack floors

These errors explain most cracked, dusty or hollow-sounding floors.

  1. Ordering on finished volume. Dry materials shrink, so order 1.33 times the floor volume.
  2. Using building sand. Soft sand produces a weak screed that dusts and cracks.
  3. Going too thin. A floating screed under 65 mm can crack over insulation.
  4. Skipping the fibres. Floors above heating pipes expand and contract with every heating cycle.
  5. Tiling too soon. Damp screed can leave tiles sounding hollow, as our hollow tiles guide explains.
  6. Forgetting the edge strip. Liquid screed requires a compressible strip around every wall.

Tiling the floor next? Our tile calculator counts the tiles, and our tile adhesive calculator sizes the adhesive.

FAQ

Screed calculator FAQs

Multiply the floor area by the depth in metres. Then multiply by 1.33 for the dry sand and cement. The calculator completes both steps automatically.

Approximately 1.7 tonnes of sharp sand and 15.3 bags of cement at 4:1. Round up to 16 bags, plus your waste allowance.

A 4:1 mix of sharp sand to cement suits most domestic floors. Choose 3:1 for thin bonded screeds and heavy traffic.

Approximately £12 to £20 per m² installed for sand and cement. Liquid screed typically costs £18 to £35, plus VAT.

Installed liquid screed works out at approximately £360 to £560 per m³ at 50 mm. Smaller floors pay a minimum charge.

Bonded screeds need 25 to 40 mm, and unbonded screeds need at least 50 mm. Floating screeds need 65 mm, or 75 mm for heavier loads.

Sand and cement needs at least 65 mm in total. Liquid screed needs 30 mm above the pipes, so about 50 mm with 16 mm pipes.

Allow one day per millimetre for the first 40 mm, then about two days per additional millimetre. Test the moisture before laying flooring.

A 50 mm screed needs about 20 kg of cement and 89 kg of sharp sand per m². That is just under one 25 kg bag of cement.

Washed sharp sand, also sold as concreting or grit sand. Never use soft building sand, because it produces a weak floor.

Yes, if the existing screed is sound and clean. Prime it and bond the new layer, or use levelling compound below 25 mm.

Liquid screed is thinner, flatter and faster to install, and it suits underfloor heating. Traditional screed costs less on smaller floors and suits wet rooms.

Yes. It is completely free, needs no registration and works on mobile phones. You can download or share every estimate as an image.

Our method

How the screed calculator gets its numbers

To work out screed quantities, the calculator multiplies your area by the depth and the waste allowance. For traditional screed, it then multiplies by 1.33 for the dry materials. Finally, it divides them according to the mix ratio.

Sharp sand weighs 1.6 t/m³ and cement 1.44 t/m³, the same as our sand and paving calculators. Installation prices come from 2026 UK contractor rates, and minimum depths follow BS 8204 guidance.

Remember the cement that ran out before lunch? Ordering on dry volume, with 5% extra, keeps the mixer turning until you complete the final bay. Prices checked in October 2026. Treat results as estimates, and confirm the specification with your screeder.

What floor are you screeding, and did you choose sand and cement or liquid screed? Tell us through our contact page. Real projects help us improve the calculator.